To achieve these goals, the refinery implemented a closed loop, multi-unit dynamic optimization solution that minimizes the gap between planning, scheduling and actual operations. More specifically, unit operations and routings in the middle distillate were modeled to allow Aspen GDOT’s™ real-time optimizer to provide targets for the underlying APC applications, resulting in more consistent, efficient production.
In this on-demand webinar experts from Heide Refinery, Applied Manufacturing Technology and AspenTech share insights on the solution. Learn how Aspen GDOT enabled them to:
See how Heide achieves optimal blended production with minimum giveaway.