On-Demand Webinar

ExxonMobil's Experiences Utilizing Adaptive Process Control to Deploy and Maintain APC Applications

Adaptive Process Control is changing the way major organizations like ExxonMobil build and maintain APC controllers. In this webinar, ExxonMobil experts will share the benefits they achieved by using Adaptive Process Control technology within Aspen DMC3 to deploy and maintain APC applications across their organization.

On-Demand Webinar

More Efficient Data Management with Aspen IP.21

Discover the power and flexibility of Aspen IP.21 with aspenONE Process Explorer and how it allows you to use your existing metadata, while reducing tag consumption.

Micro Case Study

Micro Case Study: Borealis

A snapshot of the full Asian Refiner case study by providing the problem, approach, solution and benefit at a high level.

Micro Case Study

Micro Case Study: Borealis

A snapshot of the full Borealis case study by providing the problem, approach, solution and benefit at a high level.

Micro Case Study

Micro Case Study: Petronas

A snapshot of the full Petronas case study by providing the problem, approach, solution and benefit at a high level.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

White Paper

Acid Gas Cleaning Validation: Liquid Hydrocarbons

Learn about the acid gas removal process and underlying technology for the Acid Gas - Liquid Treating Property Package in Aspen HYSYS used for solvents used for treating liquid hydrocarbons. Validation results

Case Study

Strategic Estimating Systems (SES)

Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.

Case Study

S&B Engineers Case Study

Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Page 319 of 354