Article
When Lightning Strikes Twice
After an electrical storm stopped gas production at one of its plants, SABIC executives and reliability engineers turned to Aspen Fidelis Reliability to calculate the probability of it—or a similarly debilitating event—happening again. Read this article from Plant Services to learn more.
Article
The LNG Market Needs Digital Disruption
As operators seek ongoing investment and replacement of assets for the stability of hydrocarbon markets, what is next in LNG and beyond? How do firms rise to the top of the class in terms of returns on exploration investment, instead of bottom of the barrel? This article talks about how Industry leaders bring all aspects of an asset development into concurrency—from exploration to reservoir studies to engineering design to construction and operation—and the use of digitalization, technology and big data.
Video
Batch Scheduling with Aspen Plant Scheduler
With Batch scheduling utilizing Aspen Plant Scheduler, companies can increase production throughput and maximize tank utilization. Batch manufacturers are seeking ways to improve on time order fulfillment, utilize their assets efficiently, and increase throughput. Schedule creation and optimization with the capability to model complex multi-stage operations is key to success in this increasingly competitive environment.
Video
Polymers Scheduling with Aspen Plant Scheduler
With polymers scheduling utilizing Aspen Plant Scheduler, companies can improve throughput and reduce the number of transitions while simultaneously achieving high on-time order fulfillment rates. Polymer manufacturers are looking for ways to increase on time order fulfillment, unlock their plants “hidden capacity," and reduce total time spent in transitions. Scheduling with intuitive product wheels and powerful sequence optimization methods assists in achieving these goals.
Page 215 of 362