Blog
Preparing for the 2030 Engineer
The engineers of 2030 will come to the workforce equipped with a much different skill set – and set of expectations for their employers.
Blog
Women’s Leadership Forum Year in Review
It was a great year for the AspenTech Women's Leadership Forum: we celebrated many successful events, developed new connections in the company and the larger community, and expanded our mission and vision statements based on what we've learned over the last few years.
Brochure
Aspen Supply Chain Planner
Maximize business profitability by determining the optimal production plan for even the most complex supply chains. Download this Aspen Supply Chain Planner brochure to learn more.
Brochure
Aspen Supply Chain Planner
Maximice la rentabilidad de su negocio determinando los planes óptimos de la cadena de suministro incluso para las cadenas de suministro más complejas.
Case Study
Shell Adopts Global Supply Chain Process to Increase Profitability and Drive an “Enterprise First” Strategy
After the company identified uncommon operating procedures at each of its many refineries — which led to inefficiencies and lower margins — Shell launched “Enterprise First,” an initiative designed to standardize processes and technology across the organization. The key to driving this strategy — and meeting its objectives — is an integrated aspenONE® Supply Chain Management solution that helps Shell optimize refinery production, reduce costs and increase margin.
Brochure
Aspen Petroleum Scheduler Brochure
Learn how Aspen Petroleum Scheduler enables fast, accurate and collaborative creation of the refinery schedule with integration to refinery planning, blending and dock operations.
On-Demand Webinar
Dow Chemical Makes Better Scheduling Decisions in its Coatings and Polyurethanes Businesses with Aspen Plant Scheduler
The Dow Chemical Company has been leveraging Aspen Plant SchedulerTM to improve customer service and maximize asset utilization for over 20 years. Dow’s internal center of excellence has found Aspen Plant Scheduler to be well suited to address the complex schedule requirements of many of its manufacturing sites. In this presentation, Dow will review how Aspen Plant Scheduler is enabling it to make better scheduling decisions for both its Coatings and Polyurethanes Businesses, optimizing raw material, production and loading rack scheduling against complex constraints and varying demand. Dow has deployed Aspen Plant Scheduler to over 50 plants and has plans to for additional global rollouts. Come hear how Dow Chemical leverages Aspen Plant Scheduler to improve its scheduling capability in support of changing market and customer expectations.
Page 184 of 362