Case Study

Major European Refinery Uses Process Simulation Technology to Improve Energy Efficiency & Yields

Learn how a major European refinery reduced energy usage and improved high-value product yields by leveraging the integration of process simulation technology and energy analysis to identify opportunities for greater energy efficiency.

Case Study

Mitsubishi Chemical Uses Aspen Hybrid Models to Detect and Avoid Product Quality Issues

Mitsubishi Chemical Group Corporation, Japan’s largest chemical company, faced quality problems in the company's polymer manufacturing processes that could not be detected on time, resulting in impacts to production. Using Aspen Hybrid Models with Aspen Plus®, Mitsubishi Chemical Group Corporation had the opportunity to create a robust and performant model that accurately predicted quality issues and supported preventive actions.

Case Study

Researchers Develop More Efficient Oleochemical Fractionation with AspenTech® Performance Engineering

This case study details the work done at the Universiti Malaysia Pahang to research oleochemical fractionation to how to make the process more sustainable, reducing process carbon footprint. The case study explores the AspenTech solutions implemented as well as the value created.

Case Study

Petro Rabigh Uses Aspen Hybrid Models™ to Improve Margin and Reduce Operational Risk

Petro Rabigh wanted to improve margins for refinery products, to do so, they needed to identify the most optimal production yields and qualities of their refinery and petrochemical products.

Case Study

Japanese Pharmaceutical Company Improves Quality with Aspen Plus®

A 140-year-old global pharmaceutical company with headquarters in Japan adopted Aspen Plus to improve the synthesis of a new active pharmaceutical ingredient (API). Aspen Plus provided an in-depth understanding of a new API process leading to equipment improvements and optimized recipes that enabled development of a continuous process.

Case Study

Una refinería de petróleo sudafricana utiliza una solución de estimación del ciclo de vida para ofrecer estimados de costos de capital consistentes y acelerar la ejecución del proyecto

Conozca cómo SAPREF, la refinería de petróleo crudo más grande de Sudáfrica, utilizó Aspen Capital Cost Estimator™ (ACCE) para abordar los desafíos que enfrenta su grupo de estimación, incluidas las importantes limitaciones de recursos y la falta de pautas, herramientas, sistemas y servicios integrales establecidos.

Case Study

SAPREF Improves Project Execution and Reduces Bottom Line Project Costs

Learn how SAPREF, the largest crude oil refinery in South Africa, used Aspen Capital Cost Estimator™ (ACCE) to address challenges faced by its estimation group, including significant resource limitations, and a lack of established guidelines, tools, systems and comprehensive historical data.

Case Study

HITA NV Uses Subsurface Modeling Capability to Create Accurate, State-of-the-Art Depth Models

HITA NV is a Belgian company focused on the development of deep geothermal energy. To reduce risks in deep geothermal projects, HITA used seismic modeling solution, Aspen SKUA-GOCAD to integrate and covert data, enabling them to:

Case Study

SABIC Continuously Optimizes its Utility System to Reduce Emissions and Increase Plant Energy Efficiencies

SABIC is a leading multinational manufacturing company, specializing in the manufacture of petrochemicals, chemicals, industrial polymers, fertilizers and metals. Energy efficiency is a key focus area for SABIC. To close the gap towards achieving 2025 goals, SABIC identified the need to quantify energy losses and execute actions to optimize operations while addressing daily plant challenges.

Case Study

Compañía de Energía ahorra $6M USD usando un Digital Twin en Performance Engineering

Conozca cómo una importante compañía de energía en Sudamérica utiliza Aspen Exchanger Design & Rating™ y Aspen HYSYS® para modelar y simular el circuito de reboiler y la torre regeneradora. El modelo de Digital Twin identificó una inestabilidad hidráulica en el sistema termosifónico y le permitió ahorrar $6M USD anuales, evitar daños de la torre y sistemas asociados y mucho más.

Page 1 of 2