Case Study

Perstorp Develops KPI Production Portal to Focus Organization on Meeting Plant Production Targets

Large Specialty Chemical Company develops advanced KPI production partial portal tool using Aspen InfoPlus.21 tools, building upon their extensive Aspen InfoPlus.21 installation.

Case Study

Owens Corning Standardizes on Aspen Plant Scheduler and Receives Rapid Deployment Results

Find out how Owens Corning went live concurrently across 14 manufacturing locations with Aspen Plant Scheduler in less than 12 weeks, and enabled schedulers to make decisions that were impossible to make just a few years earlier.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

Oxiteno Plant Operations Reacts Quickly to Market Demand

Oxiteno has used the aspenONE® Engineering suite extensively over the past 25 years to modify and optimize current units, as well as design new units with complex configurations. Learn more.

Case Study

Petrochemical Production Facility Drives Value and Maximizes Return with Non-linear APC

Non-linear Advanced Process Control (APC) improved SCG’s product stability and quality, minimized variations, and enabled enhanced transition strategies.

Case Study

PEMEX agiliza la ejecución de proyectos con diseño optimizado y estimación de costo

Descubra por qué PEMEX eligió una solución de aspenONE para ayudarlo a construir un Centro de Excelencia para impulsar el rendimiento operativo.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Mine Moves from Calendar-based to Prescriptive Maintenance with Aspen Mtell

When one of the world’s largest fully integrated zinc and lead smelting and refining complexes wanted to improve their metallurgical operations, the company turned to Aspen Mtell® prescriptive maintenance.

Blog

Aspen Technology to Present at the Pacific Crest Emerging Technology Summit

Aspen Technology to Present at the Pacific Crest Emerging Technology Summit

Executive Brief

EPC Perspectives: Accelerating Digital Transformation

EPC firms that were already under stress from the COVID-related downturn are investing heavily in digitalization initiatives. According to a June 2020 McKinsey report, EPCs have an opportunity to double their profitability by embracing a handful of “emerging disruptors.” One of these disruptors, digitalization of processes, is within reach for most EPCs and aligns with efforts and initiatives already underway at many firms.

Page 141 of 221