FAQ Document

Top 10 Questions About Aspen Operator Training

New to the aspenONE Engineering suite with V10.1, Aspen Operator Training (AOT) enables the seamless deployment of training for operators and engineers. AOT is a dynamic simulation lifecycle solution that brings operator training simulation (OTS) online sooner and sustains safety throughout the lifetime of the asset. AOT is based on technology acquired from Inprocess Technology and Consulting Group in 2017.

Case Study

Optimización de la producción en transporte e instalaciones de producción de gas natural con una solución integral de ingeniería

Aprenda cómo YPFB Andina aumentó su producción de gas utilizando una solución de modelo integrado que proporcionó un aumento en las ganancias por $ 280 millones en 1 año.

Case Study

Global Supermajor Deploys Aspen PIMS-AO™ Globally

This case study details the methodical approach a global supermajor took, utilizing best-in-class technology, to improve production planning in global refineries and chemical plants with Aspen PIMS-AO technology. Based on side-by-side testing of different technologies, Aspen PIMS-AO led to new insights, increased confidence in results and enhanced conversations with traders.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Infographic

Global Engineering Collaboration Infographic

See how aspenONE Engineering enables streamlined conceptual engineering and FEED workflow.

Infographic

Why Model Accuracy is Important

Why is having an accurate planning model important? It demonstrates visually how a 1% error can cost millions.

Case Study

Importante fábrica química europea implementa software de planeación y programación para elastómeros y estirénicos

Conozca cómo una importante fábrica química europea implementó aspenONE Supply Chain Management y la integró con su sistema ERP de SAP pudiendo así reducir sus inventarios en un 20%, alcanzar un 97% de precisión para entregas a tiempo y reducir el número de transiciones de campaña en un 20%.

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Leading Pulp and Paper Manufacturer Detects and Avoids Major Fire with Aspen Mtell

Aspen Mtell provided a nine-day advance warning of imminent kiln overheating, allowing the plant to change operating conditions and avoid an operational shutdown. Download this case study to learn more.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Page 139 of 221