Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Liquid Light Achieves Process Simplification and Reduces Costs

In order to meet their design need of maintaining a 25% cost advantage over conventional chemical processes, the engineers at Liquid Light needed a flexible software solution to find key property data (even for non-ideal and electrolyte systems), conduct “what-if” and case analyses, model reaction systems, select solvents, and scale-up quickly and reliably. Leveraging Aspen Plus and Aspen Properties, the members of Liquid Light have been able to make meaningful predictions about system behavior, moving them closer to full scale production.

Case Study

Next Generation of APC Delivers Benefits for Ethylene Manufacturer

Learn how Qenos, an Austrailian ethylene manufacturer, used Aspen DMC3 to revamp a demethaniser controller with very limited resources and achieved a 5-10% increase in cold end throughput, a 40% reduction in variability in overhead methane, and a 20% reduction in tower dP.

Case Study

Lubrizol社Aspen Plus®活用事例 プロセス開発時間の短縮

Lubrizol社がどのようにAspen Plus を活用し、包括的にプロセス開発を行い、短期市場投入を実現しているか事例をご紹介します。

Case Study

Major European Chemical Producer Implements Planning and Scheduling Software for Elastomers and Styrenics

Learn how a major European chemical producer implemented aspenONE® Supply Chain Management, integrated to their SAP ERP system, and was able to reduce inventories by 20%, achieve 97% on time deliveries, and reduce the number of campaign transitions by 20%.

Case Study

Maturus Optimi Gets Out of the Gate Fast

Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.

Case Study

Perstorp Develops KPI Production Portal to Focus Organization on Meeting Plant Production Targets

Large Specialty Chemical Company develops advanced KPI production partial portal tool using Aspen InfoPlus.21 tools, building upon their extensive Aspen InfoPlus.21 installation.

Case Study

Owens Corning Standardizes on Aspen Plant Scheduler and Receives Rapid Deployment Results

Find out how Owens Corning went live concurrently across 14 manufacturing locations with Aspen Plant Scheduler in less than 12 weeks, and enabled schedulers to make decisions that were impossible to make just a few years earlier.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.