Case Study

Data-Driven Maintenance Planning Saves $1.8 Million USD Per Year in Shutdown Costs

A global provider of knowledge-based maintenance, modifications and asset integrity services wanted to take a more data-driven approach to planned maintenance and reduce unplanned downtime to optimize lifecycle costs.

Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Liquid Light Achieves Process Simplification and Reduces Costs

In order to meet their design need of maintaining a 25% cost advantage over conventional chemical processes, the engineers at Liquid Light needed a flexible software solution to find key property data (even for non-ideal and electrolyte systems), conduct “what-if” and case analyses, model reaction systems, select solvents, and scale-up quickly and reliably. Leveraging Aspen Plus and Aspen Properties, the members of Liquid Light have been able to make meaningful predictions about system behavior, moving them closer to full scale production.

Case Study

Maturus Optimi Gets Out of the Gate Fast

Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.

Case Study

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.

Case Study

PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating

Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.

Case Study

Petrofac Improves Process Design Accuracy by Debottlenecking Gas Processes Increasing Capacity by 20%

Download this case study to learn how Petrofac used Aspen HYSYS with Activated EDR models to optimize heat exchanger selection and configuration for a gas production client. This solution achieved the client's goal by increasing gas field production 20%, and as a bonus, reduced CAPEX 25%.

Case Study

Pan Pacific Relies on Process Modeling to Optimize Algae-to-Biofuel Conversion (Aspen Plus)

Pan Pacific Technologies was seeking a rigorous approach to validate the technical and economic feasibility of its proprietary algal conversion concepts. Through innovative use of Aspen Plus and Aspen Process Economic Analyzer, they developed successful technical and economic models with applications in both academia and industry.

Page 1 of 3