A global petrochemical producer wanted to improve monitoring and efficiency, specifically starting with energy consumption, of its pyrolysis furnaces by integrating a predictive vision. With the current process, it was challenging to maintain unit efficiency and stay at a consistent operating level. The company was able to solve these challenges by implementing Aspen ProMV™.
Discover how the company addressed energy consumption in its pyrolysis furnaces and reduced fuel/gas consumption by 50-75 kg/hr.