Discover how Marathon Petroleum Corporation (MPC) used Aspen Petroleum Scheduler (APS) to develop a single cradle-to-grave barrel tracking system. Once MPC started using APS, they could provide operations with better targets on unit rates and reduce the number of operational changes that were made by 70%. This allowed the process units to spend more time on a stable operation.