Bulk Chemicals
バルクケミカル
Integration with Detailed Engineering
AspenTech's integrated model-based estimating tool helps deliver bids with optimized designs faster from concept design through 3D model development.
Aspen Capital Cost Estimator Online Trials
Accelerate project execution by using volumetric models and one common costing method from conceptual to detailed engineering, leveraging the speed and agility of the market-leading cost estimation solution.
Bidding and Cost Estimation
Minimize estimating risk and develop bids faster through the improved consistency and accuracy of an integrated, model-based estimating system.
Concurrent Conceptual Engineering
Simultaneous engineering and costing, heat exchanger design, Optioneering, Concurrent Conceptual Engineering, Risk Analysis
Fast Bid Packages for Licensors
Reduce the cost and time of designing and releasing bid packages with an integrated estimating platform leveraging reusable modular templates.
Project Cost Estimation
Improve transparency and lower CAPEX though use of a shared model-based estimating platform from conceptual engineering through construction.
The Self-Optimizing Plant
$name
Knowledge
Front-End Digital Twins Will Play a Major Role in Improving Project Outcomes
Learn why the development of digital twins for Front-End Engineering Design (FEED) provides better, faster and more efficient ways to approach plant design.
Wednesday, July 24, 2024
Thursday, July 25, 2024
Tuesday, August 6, 2024