Bulk Chemicals

バルクケミカル

Integration with Detailed Engineering

AspenTech's integrated model-based estimating tool helps deliver bids with optimized designs faster from concept design through 3D model development.

Aspen Capital Cost Estimator Online Trials

Accelerate project execution by using volumetric models and one common costing method from conceptual to detailed engineering, leveraging the speed and agility of the market-leading cost estimation solution.

Bidding and Cost Estimation

Minimize estimating risk and develop bids faster through the improved consistency and accuracy of an integrated, model-based estimating system.

Concurrent Conceptual Engineering

Simultaneous engineering and costing, heat exchanger design, Optioneering, Concurrent Conceptual Engineering, Risk Analysis

Fast Bid Packages for Licensors

Reduce the cost and time of designing and releasing bid packages with an integrated estimating platform leveraging reusable modular templates.

Project Cost Estimation

Improve transparency and lower CAPEX though use of a shared model-based estimating platform from conceptual engineering through construction.

Knowledge

$name

Blog

Front-End Digital Twins Will Play a Major Role in Improving Project Outcomes

Learn why the development of digital twins for Front-End Engineering Design (FEED) provides better, faster and more efficient ways to approach plant design.

Page 1 of 14