Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Case Study

Infineum Increases Production by 2,000 Tons per Year with Global Information Management System

Learn why this world-class specialty chemical producer turned to manufacturing execution systems (MES) solutions from AspenTech to improve manufacturing efficiency and increase annual production.

Infographic

Global Engineering Collaboration Infographic

See how aspenONE Engineering enables streamlined conceptual engineering and FEED workflow.

Infographic

Why Model Accuracy is Important

Why is having an accurate planning model important? It demonstrates visually how a 1% error can cost millions.

Case Study

Importante fábrica química europea implementa software de planeación y programación para elastómeros y estirénicos

Conozca cómo una importante fábrica química europea implementó aspenONE Supply Chain Management y la integró con su sistema ERP de SAP pudiendo así reducir sus inventarios en un 20%, alcanzar un 97% de precisión para entregas a tiempo y reducir el número de transiciones de campaña en un 20%.

Infographic

Win the Bidding Game

Win the bidding game! Maximize effectiveness with organizational alignment, implementation of software and a change in workflow process.

Case Study

Increasing Capacity in Sulfur Production Using Sulsim Modeling

Siirtec Nigi increased their sulfur production from 50 to 90 tons per day using Aspen HYSYS Sulsim to simulate the case study and conduct a sensitivity analysis around their oxygen enrichment. The new process required minimal equipment changes and no additional downtime other than turnaround.

Case Study

Leading Pulp and Paper Manufacturer Detects and Avoids Major Fire with Aspen Mtell

Aspen Mtell provided a nine-day advance warning of imminent kiln overheating, allowing the plant to change operating conditions and avoid an operational shutdown. Download this case study to learn more.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

Multivariate Statistical Analysis Finds Cause of Quench Oil High-Viscosity Issue

One of the world's largest chemical, plastic and refining companies used Aspen ProMV to understand and resolve production problems caused by an ongoing quench oil high-viscosity issue. In this case study, learn how Aspen ProMV enabled the company to highlight the top process variables highly correlated with viscosity issues, and quickly guided process engineers to the underlying issue to limit losses.

Page 220 of 221