Case Study

Perstorp Develops KPI Production Portal to Focus Organization on Meeting Plant Production Targets

Large Specialty Chemical Company develops advanced KPI production partial portal tool using Aspen InfoPlus.21 tools, building upon their extensive Aspen InfoPlus.21 installation.

Case Study

GlaxoSmithKline Speeds up Batch Release Time: A Study in Digital Transformation

GlaxoSmithKline (GSK) wanted to review the structure of its batch production record and associated workflows as part of a continuous improvement process. Reducing batch review time usually results in faster batch cycle time, meaning higher throughput at the production facility and faster cash-to-cash cycle time. AspenTech was selected for this process due to integration with other solutions, such as Aspen InfoPlus.21® and GSK’s existing plant automation software (DCS). The pilot project was a resounding success, reducing order preparation time by 95% and record review time by over 50%.

Case Study

Infineum Increases Production by 2,000 Tons per Year with Global Information Management System

Learn why this world-class specialty chemical producer turned to manufacturing execution systems (MES) solutions from AspenTech to improve manufacturing efficiency and increase annual production.

Page 1 of 1