Case Study

创新快车道:节约新产品开发的时间和成本

了解凯诺斯公司如何借助Aspen Plus®间歇模拟,获得关于流程的宝贵见解,从而减少工厂试验和实验,保证流程响应不断变化的客户需求。

Case Study

혁신을 위한 패스트 트랙: 신제품 개발 시간 및 비용 절감

Qenos 사가 Aspen Plus®의 회분식 모델링을 어떻게 자사의 공정에 적용하여 변화하는 고객의 요구에 맞춰 플랜트 검증 단계를 최소화하고, 고객 맞춤형 제품을 신속하게 시장에 공급할 수 있었는지 실제 사례를 소개합니다.

Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Case Study

GlaxoSmithKline Speeds up Batch Release Time: A Study in Digital Transformation

GlaxoSmithKline (GSK) wanted to review the structure of its batch production record and associated workflows as part of a continuous improvement process. Reducing batch review time usually results in faster batch cycle time, meaning higher throughput at the production facility and faster cash-to-cash cycle time. AspenTech was selected for this process due to integration with other solutions, such as Aspen InfoPlus.21® and GSK’s existing plant automation software (DCS). The pilot project was a resounding success, reducing order preparation time by 95% and record review time by over 50%.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Case Study

Global Supermajor Deploys Aspen PIMS-AO™ Globally

This case study details the methodical approach a global supermajor took, utilizing best-in-class technology, to improve production planning in global refineries and chemical plants with Aspen PIMS-AO technology. Based on side-by-side testing of different technologies, Aspen PIMS-AO led to new insights, increased confidence in results and enhanced conversations with traders.

Case Study

Graham Hart

Graham Hart achieves 97% on time delivery of complex heat exchangers through use of HYSYS and Aspen EDR.

Case Study

Leading Pulp and Paper Manufacturer Detects and Avoids Major Fire with Aspen Mtell

Aspen Mtell provided a nine-day advance warning of imminent kiln overheating, allowing the plant to change operating conditions and avoid an operational shutdown. Download this case study to learn more.

White Paper

Keep Projects on Track: Improve Communication During Estimating

ACCE is central to your strategy to lower CAPEX for your bids or estimates by being one common bidding and estimating platform across the bidding cycle.

Page 59 of 221