Case Study

HGA Boosts Ability to Efficiently Complete Relief Sizing with aspenONE Engineering

The PSV sizing capabilities in Aspen HYSYS have helped HGA achieve approximately 50% time savings on the entire overpressure protection workflow.

Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Two Looming Failures Stopped Within Two Weeks of Monitoring

Executives at this mining company were looking for a new approach to proactively handle reliability issues for critical equipment.

Case Study

GlaxoSmithKline Speeds up Batch Release Time: A Study in Digital Transformation

GlaxoSmithKline (GSK) wanted to review the structure of its batch production record and associated workflows as part of a continuous improvement process. Reducing batch review time usually results in faster batch cycle time, meaning higher throughput at the production facility and faster cash-to-cash cycle time. AspenTech was selected for this process due to integration with other solutions, such as Aspen InfoPlus.21® and GSK’s existing plant automation software (DCS). The pilot project was a resounding success, reducing order preparation time by 95% and record review time by over 50%.

Case Study

US Railway Saves Millions by Preventing Line of Road Failures

A major transportation company responsible for delivering customer goods on time, safely and reliably, was plagued by catastrophic failures of locomotives that had gone undetected by its current reliability techniques. Using Aspen Mtell to examine data from engine lube oil samples, a leading U.S. railway was able to save millions of dollars.

Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Global Engineering Organization Improves Bids and Estimates with Aspen Capital Cost Estimator

Linde Engineering North America monitors construction costs and progress using ACCE linked to 3D models driving down the cost of the estimate.

Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Case Study

Global Refinery Deploys Cost Estimation Solution to Accelerate Decision Making and Lower Costs

Phillips66 improves estimating productivity by 85% and reduces estimating variability to +/-15% with a five year before and after analysis of estimates vs. completed projects. Download the case study to learn more.

FAQ Document

Top 10 Questions About Aspen Operator Training

New to the aspenONE Engineering suite with V10.1, Aspen Operator Training (AOT) enables the seamless deployment of training for operators and engineers. AOT is a dynamic simulation lifecycle solution that brings operator training simulation (OTS) online sooner and sustains safety throughout the lifetime of the asset. AOT is based on technology acquired from Inprocess Technology and Consulting Group in 2017.

Page 209 of 221