Case Study

GlaxoSmithKline Speeds Up Batch Release Time: A Study in Digital Transformation

GSK wanted to review the structure of its batch production record and associated workflows as part of a continuous improvement process. AspenTech was selected for this process due to integration with other solutions, such as Aspen InfoPlus.21® and GSK’s existing plant automation software (DCS). The pilot project was a resounding success, reducing order preparation time by 95% and record review time by over 50%. Read this case study to learn more.

Case Study

Ferring Prototypes Continuous Manufacturing with Advanced PAT and Closed-Loop Control, Potential for Dramatically Lower COGS

Ferring Pharmaceuticals, a multinational biopharmaceutical company, needed a solution that would enable faster commercialization, more cost-efficient production and reduced supply lead time while maintaining product quality in support of digitalization initiatives. The company used AspenTech’s Advanced Process Analytical Technology (PAT) solution—which includes Aspen Unscrambler™ and Aspen Process Pulse™—to address this challenge.

Case Study

Japanese Pharmaceutical Company Improves Quality with Aspen Plus®

A 140-year-old global pharmaceutical company with headquarters in Japan adopted Aspen Plus to improve the synthesis of a new active pharmaceutical ingredient (API). Aspen Plus provided an in-depth understanding of a new API process leading to equipment improvements and optimized recipes that enabled development of a continuous process.

Page 1 of 1